(15-01-2023, 05:52 PM)wassy04 Wrote: (15-01-2023, 04:45 PM)nffc93 Wrote: I heard again at the ground yesterday that the stadium development will not be starting at the end of the season which is a massive shame.
Any idea why?
My guess is that the condition on the planning permission relating to the boat club being relocated before work can start cannot be completed before the end of the season. To do so, a new site for the club would need to be found, a building designed, which they'd have to approve, and planning permission needs to be gained for it. You dont do all of that in a couple of months.
Posts: 4,209
Threads: 0
Joined: Jul 2018
Reputation:
24
In the draft 106 agreement there is a bit saying we could provide them with a temporary structure/building
Posts: 19,395
Threads: 602
Joined: May 2018
Reputation:
206
Location: Athens
Why would the boat club have to be relocated before we can START.
Of course it won't be there when we finish but that is another matter.
Panic on the streets of London
Posts: 4,935
Threads: 5
Joined: Jun 2018
Reputation:
47
Needs demolishing as it’s on the footprint of the build.
There has been some progress and can’t see that as the only reason we won’t start in May/ June…
Costs have almost doubled!
Posts: 4
Threads: 0
Joined: Nov 2018
Reputation:
0
There were discussions for them to relocate temporarily to the ON's sports ground on Adbolton Lane, next to the sailing club. Nothing seems to have come of that so far.
Posts: 12,707
Threads: 40
Joined: May 2018
Reputation:
69
David Ornstein saying work on the Peter Taylor stand will not start after this season:
At the same time, the club have been weighing up the pros and cons of the best time to knock down their Peter Taylor Stand and put up a replacement that would increase the 30,000 capacity to 35,000 and bring the stadium more in line with demand.
Planning permission was granted last July but the downside is that the building work would mean Forest operating, in effect, with only three stands until everything was completed.
That work was initially due to start this summer but may now be put back until 2024 owing to the complexities of the planning permission and various other considerations. In the meantime, Forest have recently renovated the dressing rooms, which are situated in the relevant stand, and also the adjoining tunnel area.
Posts: 2,053
Threads: 1
Joined: Jul 2018
Reputation:
27
Im guessing they realise how valuable the CG atmosphere is to PL survival.
I’d warrant they will wait until the team are more established and can get results away from home before taking the plunge.
Posts: 2,318
Threads: 0
Joined: Aug 2021
Reputation:
24
(13-03-2023, 10:30 AM)DR Forest Wrote: Im guessing they realise how valuable the CG atmosphere is to PL survival.
I’d warrant they will wait until the team are more established and can get results away from home before taking the plunge.
I would have thought if we got relegated that would be a perfect time to start it. If it isn't, when is? It's going to cause disruption when ever they do it.
Posts: 10,933
Threads: 56
Joined: Jun 2018
Reputation:
61
I thought the issue was the massive recent increase in cost, perhaps they are just waiting until these come back down a bit at some unknown point in the future.
Posts: 1,121
Threads: 0
Joined: Jan 2019
Reputation:
5
13-03-2023, 11:28 AM
(This post was last modified: 13-03-2023, 11:29 AM by JollyLolly.)
Wassy I am in construction industry and believe me increased costs that came into play on the back of Covid and the Ukraine war will NOT come down, they may stabilise. I would hazard a guess that the cost of the new stand has increased in excess of 20% in the last 2 years!
Posts: 10,933
Threads: 56
Joined: Jun 2018
Reputation:
61
(13-03-2023, 11:28 AM)JollyLolly Wrote: Wassy I am in construction industry and believe me increased costs that came into play on the back of Covid and the Ukraine war will NOT come down, they may stabilise. I would hazard a guess that the cost of the new stand has increased in excess of 20% in the last 2 years!
Yeah sorry I meant more that they'd stabilise.
Posts: 2,053
Threads: 1
Joined: Jul 2018
Reputation:
27
13-03-2023, 12:01 PM
(This post was last modified: 13-03-2023, 12:02 PM by DR Forest.)
(13-03-2023, 11:28 AM)JollyLolly Wrote: Wassy I am in construction industry and believe me increased costs that came into play on the back of Covid and the Ukraine war will NOT come down, they may stabilise. I would hazard a guess that the cost of the new stand has increased in excess of 20% in the last 2 years!
Thanks must go to certain members of the council for their role in the delay of this project (and the postponed economic benefit to the area) at the next local elections.
|