13-03-2023, 09:04 AM
David Ornstein saying work on the Peter Taylor stand will not start after this season:
At the same time, the club have been weighing up the pros and cons of the best time to knock down their Peter Taylor Stand and put up a replacement that would increase the 30,000 capacity to 35,000 and bring the stadium more in line with demand.
Planning permission was granted last July but the downside is that the building work would mean Forest operating, in effect, with only three stands until everything was completed.
That work was initially due to start this summer but may now be put back until 2024 owing to the complexities of the planning permission and various other considerations. In the meantime, Forest have recently renovated the dressing rooms, which are situated in the relevant stand, and also the adjoining tunnel area.
At the same time, the club have been weighing up the pros and cons of the best time to knock down their Peter Taylor Stand and put up a replacement that would increase the 30,000 capacity to 35,000 and bring the stadium more in line with demand.
Planning permission was granted last July but the downside is that the building work would mean Forest operating, in effect, with only three stands until everything was completed.
That work was initially due to start this summer but may now be put back until 2024 owing to the complexities of the planning permission and various other considerations. In the meantime, Forest have recently renovated the dressing rooms, which are situated in the relevant stand, and also the adjoining tunnel area.